Technical guides and articles on PLC programming, SCADA, OT cybersecurity, control system engineering and industrial automation - written by an RPEQ engineer from real Queensland project experience.

Articles
Article Sept 2025

Commissioning a Bulk Handling Port Machine: From I/O Test to First Ore on Ship

What the commissioning of a stacker, reclaimer, or shiploader actually looks like, covering the sequence, the complexity, and what it takes to get from workshop to first movement.

Article Aug 2025

Factory Acceptance Testing for Underground Mining Equipment

What a proper FAT involves for underground mining equipment, why it matters, and what distinguishes a genuine test from a document exercise.

Article July 2025

OT Asset Auditing: What a Useful OT Asset Register Actually Contains

How to build an OT asset register that is genuinely useful for cybersecurity, lifecycle planning, and incident response, not just a list of equipment names.

Article June 2025

Legacy PLC Migration to ControlLogix: Planning It Without Losing Production

How to plan and execute a legacy PLC migration, from SLC 500, GE RX3i, or Omron, to Rockwell ControlLogix without an unplanned outage.

Article May 2025

Demand Response and Real-Time Power Prices in Industrial Operations

How industrial sites can use AEMO's real-time wholesale electricity price signals to automate load shedding, reduce peak demand costs, and respond to grid events.

Article May 2025

Industrial IoT Integration: Connecting Sensors to Your PLC Without Breaking the OT Network

A practical framework for integrating IIoT sensors and devices into industrial control systems, covering protocols, architecture, and security considerations.

Article May 2025

What Good PLC Documentation Looks Like

Most industrial sites have PLC programs that were written by engineers who have since moved on, modified by contractors who left no record of what they changed, and are now maintained by a team that cannot confidently say what the program does. Here is what documentation should look like and why it matters.

Article Apr 2025

CitectSCADA to PlantSCADA: What the Migration Actually Involves

A practical guide to migrating from legacy CitectSCADA to AVEVA PlantSCADA. What changes, what carries over, and where the complexity lies.

Article Mar 2025

What Happens After a Cyber Attack on an Industrial Site

OT incident response in practice. What the first hours look like, what drives recovery time, and what sites without a plan discover the hard way.

Article Mar 2025

IT/OT Domain Migration: Separating Control Systems from the Corporate Network

Why the 'just add a firewall' approach isn't enough, and what a proper OT domain migration actually involves.

Article Feb 2025

SCADA Virtualisation in Mining and Sugar

What it involves, why sites are doing it, and what to expect when you make the move from hardware to virtual.

Have a question not covered here?

Get in touch - we're happy to talk through your specific situation.